This is the lounge wall before installation. The small gas pipe needed to be removed by a gas safe engineer before we could start work but other than that we were ready to go.
This is the lounge wall before installation. The small gas pipe needed to be removed by a gas safe engineer before we could start work but other than that we were ready to go.